Services / Plasterboard
Plasterboard

Plasterboard with SDS-INVEST
We build plasterboard partitions, suspended ceilings and attic linings. The solution is tailored to the room’s function and design.
Structure tailored to the task
We determine framing layout, number of board layers, reinforcement positions and load requirements. Fire-rated or acoustic structures follow the system documentation.
Board installation and joints
We choose boards for the interior conditions and plan movement joints and service penetrations. Installation includes the agreed joint treatment and corner preparation.
Finish standard
Before starting, we agree the surface finish level and preparation for paint or cladding. Floor plans, heights, areas and service layouts help us prepare a quote.

Poradniki: Plasterboard
How should plasterboard construction be planned?
Mark doors, recesses, lighting and services on the plan. State room heights and planned fixing points for cabinets, a TV and other heavy items.
Agree reinforcements and service access before closing the lining. Compare offers with the same board layers, insulation and finish standard.
Which surface finish standard should I choose?
Before work, show the contractor the paint type and lighting plan, particularly light grazing the walls. Agree the filling standard and whether the price covers the whole surface or joints only.
Before painting, check corners, joints and readiness for the next stage. Board selection and details should follow the system documentation.
More technical information: Board installation and finishing — Knauf. Execution details are matched to the design and the documentation of the products used.
FAQ — frequently asked questions
Is every board suitable for a bathroom?
No. The board and protection are selected for the humidity conditions and intended use. The term plasterboard construction alone does not define a complete solution.
Can cabinets be hung on a plasterboard partition?
Yes, if the construction is designed for the load. Equipment locations and weights must be agreed before the lining is built.
Does a suspended ceiling include light installation?
Ceiling construction and electrical work are separate scopes. The quotation defines openings, reinforcements and coordination with the electrical contractor.
Does joint finishing mean the surface is ready to paint?
It depends on the ordered surface standard. Agree additional filling, dust removal, priming and painting as specific stages.
What is included in the price?
Plasterboard quotations specify the profile layout, board type and layer count. Joint finishing and surface preparation standards are agreed separately.
The price includes
- Installation of framing and boards on the surfaces listed in the quotation.
- Finishing joints and corners to the agreed standard.
- Profiles, boards, fixings and compounds specified in the materials-inclusive option.
Separate quotation
- Thermal or acoustic insulation, unless part of the ordered system.
- Full-surface skim coating, priming and painting outside the agreed scope.
- Services and light installation, non-standard reinforcements, access panels and additional structures.
We confirm the final scope, materials and payment basis in an individual offer before work begins.
Let us define your project scope
We work in Bielsko-Biała and the surrounding region, including Żywiec, Cieszyn, Czechowice-Dziedzice, Pszczyna, Oświęcim, Kęty and Katowice. Describe your project — we will confirm the scope, availability and quotation process.
CONTACT SDS-INVEST
Let's talk about working together.

Planning a project, looking for a contractor, supplying materials or interested in a partnership? Get in touch — let's discuss the possibilities.