INSULATION AND FACADES

Price list

Cost consultation and facade work planning

Plan your facade budget.

Indicative SDS-INVEST service prices. Ranges are per unit shown beside the price; rates in “Renovation / preparation work” vary by task. In “Construction and roofing services”, individual materials-inclusive prices are indicative averages used for initial budgeting. Prices excluding VAT are orange; prices including 8% VAT appear below in beige. These are neither guaranteed prices nor the full range of market rates. We prepare the final offer after agreeing the scope and inspecting the property.

External wall insulation domu

Facade and installation servicesnetincl. VAT

ServiceLabourLabour and materialsQuantity
Facade insulation with 15 cm white EPS Complete ETICS system
105–145 113–157
220–260 238–281
PLN / m²
External wall insulation styropian grafit 15 cm Complete ETICS system
110–150 119–162
240–280 259–302
PLN / m²
External wall insulation styropian grafit 20 cm Complete ETICS system
115–155 124–167
265–305 286–329
PLN / m²
Facade insulation with 15 cm stone wool Complete ETICS system
135–175 146–189
310–350 335–378
PLN / m²
Facade insulation with 20 cm stone wool Complete ETICS system
145–185 157–200
345–385 373–416
PLN / m²
Installation of 15 cm EPS insulation bonding and mechanical fixing
65–105 70–113
125–165 135–178
PLN / m²
Installation of 15 cm stone wool bonding and mechanical fixing
85–125 92–135
195–235 211–254
PLN / m²
Layer zbrojona klej i mesh
20–60 22–65
45–85 49–92
PLN / m²
Silicone render 1,5 mm On a prepared substrate
30–70 32–76
65–105 70–113
PLN / m²
Mosaic render On a prepared plinth
30–70 32–76
80–120 86–130
PLN / m²
XPS plinth insulation, 10 cm With reinforcement layer and render
100–140 108–151
200–240 216–259
PLN / m²
Painting facade two coats
10–50 11–54
30–70 32–76
PLN / m²
Substrate preparation washing and priming
5–45 5–49
15–55 16–59
PLN / m²
Substrate repair and levelling local repairs, up to 10 mm
25–65 27–70
45–85 49–92
PLN / m²
External window sill installation
60–100 65–108
150 162
PLN / linear m
Installation of flashings / sheet metal elements
45–85 49–92
120 129,60
PLN / linear m
PVC window installation standard, excluding removal
60–100 65–108
400 432
PLN / linear m
External door installation with frame standard
430–470 464–508
3 500 3 780
PLN / pcs
PVC gutter installation
35–75 38–81
130–170 140–184
PLN / linear m
PVC soffit installation on a prepared subframe
35–75 38–81
100–140 108–151
PLN / m²
Metal soffit installation — coated steel On a prepared subframe
55–95 59–103
140–180 151–194
PLN / m²
Notes:

PVC gutters: materials include a standard system with brackets and connectors; downpipes are charged separately.

Soffits: installation on a prepared subframe, including panels, trims and fixings. Building or repairing the subframe, removal and scaffolding access are priced separately.

Sills and flashings are charged per linear metre, windows per linear metre of frame perimeter, and doors per unit.

Materials-inclusive prices are indicative average rates used by SDS-INVEST for budgeting, not statistical market averages.

Assumed specification: coated-steel external sill, 25–30 cm wide, with end caps and installation materials; simple coated-steel flashings up to 30 cm developed width, with fixings and seals; white triple-glazed PVC window, reference size 123 × 148 cm; single-leaf steel external door, standard size 90, with frame, threshold, lock and handle.

The window rate of PLN 400 excluding VAT per metre of perimeter corresponds to about PLN 2,168 excluding VAT for the reference window with installation (perimeter 5.42 m); other sizes and configurations require recalculation.

Prices include the product and standard installation on a prepared substrate, excluding removal, reveal repairs, crane work, transport and layered sealing. We confirm the final price after product selection and measurement.

Insulation stropów i poddaszy

Ceiling and attic insulationnetincl. VAT

ServiceLabourLabour and materialsQuantity
Concrete ceiling insulation — 25 cm EPS
40–80 43–86
155–195 167–211
PLN / m²
Reinforced concrete / Teriva ceiling insulation — 25 cm mineral wool
45–85 49–92
160–200 173–216
PLN / m²
Timber ceiling insulation — 25 cm mineral wool
90–130 97–140
200–240 216–259
PLN / m²
Attic insulation — 25 cm mineral wool On a frame
95–135 103–146
200–240 216–259
PLN / m²
Notes:

Ceilings and attics: indicative prices for 25 cm insulation, standard access and a prepared substrate.

The scope excludes old insulation removal, structural repairs, usable flooring, plasterboard lining and its finishing.

Vapour control and other layers are selected and priced after agreeing the construction build-up.

Material thickness and properties are confirmed for each building.

Construction i roofing

Services budowlane i roofingnetincl. VAT

ServiceLabourLabour and materialsQuantity
Load-bearing wall masonry — 24 cm aerated concrete
60–100 65–108
200 216
PLN / m²
Load-bearing wall masonry — 25 cm ceramic blocks
65–105 70–113
220 238
PLN / m²
Partition wall masonry — 12 cm aerated concrete
45–85 49–92
110 119
PLN / m²
Precast lintel installation standard opening
340–380 367–410
550 594
PLN / pcs
Removal of roof covering without asbestos or waste removal
20–60 22–65
Not applicable — no materials
PLN / m²
Roof membrane, counter-batten and batten installation
15–55 16–59
65 70
PLN / m²
Metal tile roofing on prepared battens
40–80 43–86
160 173
PLN / m²
Clay or concrete tile roofing on prepared battens
60–100 65–108
210 227
PLN / m²
Steel gutter installation standard system
40–80 43–86
200 216
PLN / linear m
Steel downpipe installation standard system
40–80 43–86
160 173
PLN / linear m
Notes:

Masonry rates cover standard walls without plaster, ring beams or lintels, which are priced separately.

The partition wall price including materials covers 12 cm aerated concrete blocks and mortar.

Lintels must be selected according to the design; the price covers installing a precast element, not creating a new opening in an existing wall.

Roofing rates apply to simple roof slopes and the specified work stage, excluding roof-structure repairs, scaffolding, lifts, transport and waste disposal.

Roof covering excludes membrane, battens, flashings, gutters and downpipes.

Metal flashings are a separate item in the facade and installation services section.

Average materials-inclusive prices are SDS-INVEST estimates for standard materials, not statistical averages of all offers. They include materials for the specified stage and standard fixings.

The lintel allowance assumes a small standard opening and approximately PLN 190 excluding VAT for materials; precast elements are selected according to the design.

The final price is agreed after system selection and measurements.

The final scope and VAT are confirmed in the offer.

Interior finishing and tiling

Interior finishingnetincl. VAT

ServiceLabourLabour and materialsQuantity
Internal gypsum plaster standard substrate
25–65 27–70
50–90 54–97
PLN / m²
Gypsum skim coat two coats with sanding
30–70 32–76
50–90 54–97
PLN / m²
Wall filling and levelling up to 3 mm
25–65 27–70
40–80 43–86
PLN / m²
Painting walls and ceilings two coats, excluding skim coating
10–50 11–54
30–70 32–76
PLN / m²
Plasterboard partition single board layer on both sides, excluding painting
80–120 86–130
160–200 173–216
PLN / m²
Suspended plasterboard ceiling single level, excluding painting
90–130 97–140
160–200 173–216
PLN / m²
Plasterboard wall lining on a frame excluding insulation and painting
65–105 70–113
120–160 130–173
PLN / m²
Attic plasterboard lining excluding insulation and painting
90–130 97–140
150–190 162–205
PLN / m²
Laying paneli laminowanych without trims
25–65 27–70
130 140,40
PLN / m²
Skirting board installation standard
15–55 16–59
60 64,80
PLN / linear m
Tiling do 60 × 60 cm excluding substrate levelling
110–150 119–162
250 270
PLN / m²
Waterproofing under tiles two coats
25–65 27–70
45–85 49–92
PLN / m²
Notes:

Tiles, flooring and skirting: materials-inclusive prices are indicative average rates used by SDS-INVEST, not statistical market averages.

Tiles up to 60 × 60 cm: standard tiles, adhesive and grout; laminate flooring: panels and underlay, excluding skirting; skirting: standard PVC or MDF boards and installation materials.

Prices assume a prepared substrate and exclude removal, levelling and waterproofing.

The final price depends on the selected product and scope of work.

Renovation and preparation interiors

Renovations / prace przygotowawczenetincl. VAT

ServiceLabourLabour and materialsQuantity
Protecting floors and joinery with sheeting
8–15 9–16
12–22 13–24
PLN / m²
Wallpaper removal jedna layer
15–30 16–32
20–38 22–41
PLN / m²
Scraping loose paint from walls
20–35 22–38
25–42 27–45
PLN / m²
Removal of floating flooring and underlay
12–25 13–27
16–30 17–32
PLN / m²
Removal of skirting boards
6–12 6–13
8–15 9–16
PLN / linear m
Removal of wall or floor tiles
45–75 49–81
55–90 59–97
PLN / m²
Removal of internal plaster Thickness do 2 cm
30–55 32–59
38–65 41–70
PLN / m²
Removal of a plasterboard partition excluding utilities
35–60 38–65
45–75 49–81
PLN / m²
Demolition of a brick partition Thickness do 12 cm
80–120 86–130
95–140 103–151
PLN / m²
Removal of an internal door and frame
100–180 108–194
120–210 130–227
PLN / pcs
Removal of a toilet or washbasin after disconnecting utilities
80–140 86–151
95–165 103–178
PLN / pcs
Removal of a bath or shower enclosure after disconnecting utilities
150–250 162–270
175–290 189–313
PLN / pcs
Priming walls or floors jedna layer
8–14 9–15
12–20 13–22
PLN / m²
Local plaster repairs Layer do 10 mm
35–60 38–65
50–80 54–86
PLN / m²
Repair of non-structural cracks with tape
25–45 27–49
35–60 38–65
PLN / linear m
Self-levelling screed layer do 5 mm
40–65 43–70
70–105 76–113
PLN / m²
Bagging and carrying out rubble work by one person
80–120 86–130
90–135 97–146
PLN / godz.
Notes:

Indicative prices excluding VAT and including 8% VAT for standard renovation work. The applicable VAT rate is confirmed in the offer.

The materials-inclusive option covers auxiliary materials appropriate to each task, such as sheeting, tapes, bags, primer or mortar; for self-levelling screed, compound for a 5 mm layer is also included.

Excludes new doors, sanitary fittings and cladding.

Protection of the whole room and carrying out rubble are charged separately, without charging twice for the same work.

Skip, transport and waste disposal: individual quotation.

Demolition applies only to partitions after confirming their function; reinforced concrete, load-bearing walls and disconnection of services require separate pricing.

Prices depend on the area, substrate condition, floor level and access; small jobs are priced as a whole.

Project cost planning

Estimate project cost

Example: 200 m² of facade, 20 linear metres of sills and 10 linear metres of flashings. Adjust the scope and quantities to your project. Rates are editable. ETICS includes render — enter separate rendering only for an additional area.

ItemQuantityUnitNet unit rate (PLN)Net amount
Complete ETICS systemm²—
Window sillslinear m—
Flashings / sheet metal worklinear m—
Silicone render — outside the ETICS aream²—
Scaffolding — assembly and hireset—
Deliveryset—
Waste removalset—
Other costsset—

Sills, flashings and additional costs: enter individual rates for the selected scope. Blank rates with a positive quantity are excluded and flagged below. Calculator prices are base estimates, not an offer.

Net and gross — which price applies?

8% VAT may apply to qualifying work in housing covered by Poland’s social housing programme. Eligibility does not depend solely on whether the customer is a private individual. Limits include 300 m² of usable area for a detached house and 150 m² for an apartment; proportional treatment may apply above these limits. The table shows gross prices only at 8% VAT; other cases are quoted individually. Buying materials separately in the shop is not a comprehensive energy-renovation service. The applicable rate is determined for each order.

CONTACT SDS-INVEST

Let's talk about working together.

Consultant speaking on the phone — illustration

Planning a project, looking for a contractor, supplying materials or interested in a partnership? Get in touch — let's discuss the possibilities.

Enquiry: Insulation quote — price list

I am enquiring as

SDS-INVEST will use these details to respond to your enquiry. We will not subscribe you to a newsletter. Fields marked * are required.